Home
About The Company
Resume
Project Pics
Cool Stuff
Links
Contact Us
Pomponio Construction Inc
Mason Contractor
Resume

POMPONIO CONSTRUCTION INC.

24331 Heatherwood Dr. South Lyon, MI 48178

(248) 446-3051 FAX (248) 446-3052

pomconinc@ameritech.net

 

 

HISTORY:        Pomponio Constuction Inc. is a family owned and operated masonry  contractor in business for over 40 years, specializing in challenging commercial construction.

 

                           Member of Masonry Institute of Michigan since 1997.

 

VOLUME:  2002: $5.3 million; 2003: $2.5 million; 2004: $ 3.85 million; 2005: $4.5 million;

                     2006: $2.8 million; 2007: $2.5 million;  2008: $3.5 million; 2009 - 2013 - $2 million

 

CREW SIZE:      3-4 Crews – Total of 20 - 60 employees

 

SPECIAL EQUIPMENT:      - Hydro-Mobile Scaffolding

                                                - High Reach Forklifts – 55ft. /10,000lb cap.

                                               - 50 Ton Rough Terrain Crane

                                   

RECENT PROJECTS OF NOTE:

- Lifetime Fitness - Bloomfield

Location:  Bloomfield Twp, MI
Contract: $600,000
Duration:  8/13 to 1/14
Descrition: Texas Leuders Limestone in ashlar pattern, extensive interior CMU partitions

- University Campus Apartment - University of Michigan (Dearborn)

Location:  Dearborn, MI
Contract: $1.3 million
Duration:  11/12 to 8/13
Descrition: Structural Burnished CMU; Extensive splitface CMU and utility brick veneer
 

- Hyatt Place Hotel

Location:  Novi, MI
Contract: $700,000
Duration:  8/12 to 12/12
Descrition: 6 story structural CMU bearing hollowcore with utility brick exterior

- Wayne County Community College - Campus Replacement

Location:  Detroit, MI
Contract: $1 million
Duration:  7/11 to 4/12
Descrition: Extensive burnished CMU stairways and partitions; Brick veneer over CMU back up w/3" insulation

- Emagine Theater - Royal Oak

Location:  Royal Oak, MI
Contract: $850,000
Duration:  9/10 to 1/11
Descrition:  Structural decorative masonry to 48' incorporating cast stone accents in single wythe.

- Wayne County Community College - Performing Arts Center

Location:  Taylor, MI
Contract: $1.6 million
Duration:  2/08 to 1/09
Descrition:  Multiwythe structural masonry; extensive Burnished Masonry Veneer to 76 ft. height

-  Ryder Systems

Location:  Novi, MI
Contract:  $775,000
Duration:  5/07 to 7/07
Description:  3 Story brick veneer with extensive Architectural Cast Stone features

-  Fairlane Green Best Buy and Retail

Location:  Allen Park,MI
Contract:  $350,000
Duration:  1/07 (Best Buy); 10/07 (Retail)
Description:  Brick Veneer with extensive Cultured Stone features

-  Columbus Corporate

 
Location: Novi, MI
Contract:  $750,000
Duration:  7/05 to 1/06
Description:  3 Story Brick Veneer with extensive Architechtural Cast Stone features


 
-  Wal-Mart Supercenter and Sam's Club

Location:  Grand Blanc, MI
Contract:  $2.6 million
Duration:  6/05 to 12/05
Description:  350,000 square feet of retail spac; 1/2 High decorative CMU (reinforced)

 
-  Michigan First Credit Union

 
Location:  Lathrup Village
Contract:  $1.4 million
Duration:  6/05 to 11/05
Description:  3 Story office building w/ CMU back-up and partitions; 14,000 square feet of Architectural Cast Stone and Brick Veneer

-  Central Michigan University - Health Proffesions Building

Location:  Mt. Pleasant, MI
Contract: $3.85 million
Duration:  3/02 to 12/02
Description:  100,000 CMU Back-Up; 400,000 Modular Brick; 850 tons Dimensional Indiana Limestone

-  Fox Run Village

Location:  Novi, MI
Contract:  $5 million (to date)
Duration:  11/02 to present
Description: 5-6 Story Residential Buildings with Brick Veneer; 9 buildings of 20+ planned completed

-  Lifetime Fitness Centers

 
Location:  Chigago, IL (4) Facilities; Detroit, MI (6) Facilities
Contract:  $685,000 to $900,000/ building - Total $7.9 million since 1997
Duration:  7 months per building
Description:  Utility Brick Veneer; CMU Partitions; Leuder Texas Limestone

-  Arab American Musuem

Location: Dearborn, MI
Contract:  $500,000
Duration:   5/04 to 12/04
Description:  CMU Back-Up; rriscraft Renaissance Veneer ; 1 1/4"  Arriscraft Adair Cut Limestone Cladding

 
-  Additional projects of note: 

Motor City Harley Davidson addition, Gibraltar Municipal Complex, John F. Kennedy Library - Dearborn Heights, Troy Communty Center, Troy Fire Station #3, Washtenaw United Way Building, Salvation Army Adult Rehabilitiation Center, MBPIA Building - Detroit, Extensive work at Ford Motor Co., General Motors and Chrysler Corp.

HomeAbout The CompanyResumeProject PicsCool StuffLinksContact Us